Oakhill Hospital – Emergency Room Expansion
Services:
Structural Concrete
Client Type:
Institutional/Commercial
C&T Contracting Role:
Subcontractor To Gilbane
Location:
Brooksville, Fl.
The Emergency Room expansion started right amid Covid-19 pandemic. The hospital was to be kept open and operational while the 17,000 SF expansion of their emergency room wing. This project was completed in phases which included handicap parking spaces, an operational and a mechanical level and a full-service helicopter pad.
This project required high FF/FL tolerances that exceeded the ACI floor flatness and floor levelness standards. The facility was constructed in two separate phases. Dust control, overall cleanliness, and safety were paramount requirements during the construction of the facility at all times.
ALL PROJECTS