Tampa Airport Authority – Redside Enabling
Services:
Structural Concrete
Client Type:
Commercial
C&T Contracting Role:
Subcontractor To Odyssey Global
Location:
Tampa, Fl.
C&T Contracting was contracted to complete the site pavement, structure concrete wall and drainage structures to allow for the expansion of Tampa Airports Air handling building. This was a very complex schedule requiring a large amount of coordination with Hensel-Phelps and the Airport. The project was completed without any shutdowns to the traffic pattern on the Redside Arrival. The project was built in phases and with tight physical and time constraints that did not allow for the shutdown of the roadway. 28,000 SF of FDOT concrete pavement was laid and finished within a 2-week window.
ALL PROJECTS